Skip to content
DATA CENTRE DEVELOPMENT · 5–100 MW

AI-ready data centres, from site to tenant.

Single-point delivery for 5–100 MW projects.

  • 5–100 MW new builds
  • Mining-site to AI/HPC conversion
  • Power equipment supply
  • Tenant sourcing
  • B100 / B200 compute

Crown Mountain Solutions provides construction consulting and turnkey delivery for 5–100 MW data centres, converts mining sites to AI/HPC, and supplies the complete power chain. Project experience in eight countries, with offices in Texas and British Columbia. Tenant sourcing and GPU compute leasing are available once the facility is operational.

Project inquiry

Responses are provided within one business day.

No account needed. Project details stay confidential.

See reference projects
Project range
5–100 MWProject range
Countries with delivered projects
8Countries with delivered projects
Power-industry experience
30+ yrsPower-industry experience
Transformers delivered to North America, 2019–2025
137Transformers delivered to North America, 2019–2025
HOW IT WORKS

From site to revenue

A data centre generates revenue only once it is energised and leased. Most schedule risk sits in the hand-offs between consultant, contractor, equipment vendor and leasing broker. Crown Mountain covers every stage under one engagement.

Engagements can begin at any stage and continue through to operation.

Project range
5–100 MWProject range
Project stages covered
6Project stages covered
Countries delivered
8Countries delivered
Engagement process
  1. 01

    Site & power

    Grid capacity, connection path, water, fibre and permitting, assessed before capital is committed.

  2. 02

    Design

    Load schedule, single-line diagram, redundancy topology and equipment schedule, sized to target tenant requirements.

  3. 03

    Build

    EPC management or turnkey delivery, including substations, cooling plant, generators and fibre.

  4. 04

    Equip

    The full power chain from qualified manufacturers, tested and delivered on a single schedule.

  5. 05

    Fill

    Tenants matched to available capacity, density and term.

  6. 06

    Compute

    B100 / B200 GPU capacity leased to AI teams.

Owners typically engage at site selection or conversion. Equipment buyers and compute tenants typically engage at stages four and six.

WHY CROWN MOUNTAIN

Three criteria owners evaluate first

Delivery capability, time-to-power and accountability.

  • Proven delivery

    Data centre and power projects delivered in eight countries. Each project is adapted to local codes, utility requirements, permitting and contractors. North American offices manage contracts, compliance and site coordination.

    • Projects in China, Vietnam, Malaysia, Japan, South Korea, Canada, the US and Costa Rica
    • Engineers who have designed complete data centre power systems
    • Offices in Austin, TX and Richmond, BC
  • Faster to power

    Transformers, switchgear and UPS carry the longest lead times in any build. Because Crown Mountain supplies this equipment directly, procurement begins as soon as the design is frozen.

    • Direct relationships with JST, Pearl Electric, China XD, Shunde TBEA, Dongfang Electric, CATL and Delta
    • Stock units and priority production slots
    • Mining-site conversions reuse existing power and save months
  • Single point of accountability

    Consulting, delivery and equipment supply under one contract. Scope, schedule and warranty are held by one party.

    • One engagement for consulting, delivery and equipment
    • Spare parts and field service in North America after handover
    • Tenant sourcing and compute leasing aligned with the delivered facility

Figures are stated per project. Confidential references are disclosed only to the extent permitted.

Leadership
SELECTED PROJECTS

Selected projects

Mining-site conversions in British Columbia and Ohio. New builds in Malaysia and Canada. Consulting in Vietnam. Equipment for hyperscale campuses in the US.

All projects
FOOTPRINT

Eight countries, adapted to each market

Markets with delivered data centre or power projects. Each project follows local codes, utility rules and permitting, with qualified local contractors.

  • CanadaCA

    Prince George and Cranbrook, BC. Utility transformer deliveries. Office in Richmond, BC.

  • United StatesUS

    Ohio conversion. Memphis, Detroit and Georgia equipment. Texas storage. Head office in Austin.

  • Mainland ChinaCN

    Data centre and power projects.

  • VietnamVN

    Nha Trang data centre, construction consulting through commissioning.

  • MalaysiaMY

    Penang campus, design management, construction consulting and equipment.

  • JapanJP

    Data centre and power infrastructure projects. Details on request.

  • South KoreaKR

    Data centre and power infrastructure projects. Details on request.

  • Costa RicaCR

    Data centre project delivery. Details on request.

INDUSTRY PARTNERS & BUYERS

Power equipment for third-party builds

EPC contractors, developers and utilities can procure equipment independently of construction services. Long-lead power equipment from Chinese tier-one manufacturers is supplied on a single schedule, with spares and field service in North America. On-site generation is available where grid capacity is constrained.

  • Transformers to 180 MVA / 230 kV, dry-type to 69 kV, ANSI pad-mounted. UL / CSA listing confirmed per model
  • On-site power systems: Dongfang Electric gas turbines + CATL battery storage + Delta solid-state transformers
  • Critical power: Delta three-phase UPS 10 kVA – 2.5 MW with CATL lithium batteries, supplied and commissioned together
  • Transformer units in North American stock, nameplates published. Spare-parts centre and field team in Texas
Medium-voltage switchgear and transformers at a substation
MV intake, transformers, switchgear, UPS and busway. Supplied together, tested together, delivered on one schedule.
Represented and partner manufacturers
  • JST 金盘科技Transformers · switchgear
  • Pearl Electric 明珠电气Transformers · switchgear
  • China XD 西电Transformers · switchgear
  • Shunde TBEA 顺德特变Transformers · switchgear
  • Dongfang Electric 东方电气Gas turbine generation
  • CATL 宁德时代Energy storage · LFP batteries
  • Delta 台达SST · UPS · PDU · busway

Equipment is selected per project for ratings, certification and lead time, and supplied under Crown Mountain's terms, warranty and after-sales support. UL / cULus / CSA listing is confirmed per model on the quotation. Send a specification or single-line diagram to start.

INTEGRATED POWER SYSTEMS

Complete power systems from Chinese tier-one manufacturers

Two pre-engineered systems. One contract, one schedule, one warranty. The manufacturer is named on every block.

  • ON-SITE GENERATION

    Gas turbine + storage + SST

    1. Gas turbine generationDongfang Electric 东方电气
    2. Battery energy storageCATL 宁德时代
    3. Solid-state transformerDelta 台达

    For sites with no grid capacity or a connection years away. Dongfang Electric gas turbines generate on site. CATL batteries smooth the load and cover starts and peaks. Delta solid-state transformers convert MV AC to DC distribution for the hall. Sized, delivered and commissioned as one system.

    Best for: behind-the-meter data centres and mining-site conversions that cannot wait for the utility; 5–100 MW.

  • CRITICAL POWER

    UPS + lithium battery

    1. Three-phase UPSDelta 台达
    2. Lithium battery systemCATL 宁德时代

    Delta three-phase UPS, 10 kVA to 2.5 MW, with CATL lithium iron phosphate batteries. Longer runtime in less space than VRLA. Battery, UPS and bypass supplied and commissioned by one team.

    Best for: new halls, conversions and UPS replacements; N+1 and 2N.

Discuss a power system

Ratings, redundancy and battery runtime are engineered per project. Test reports and North American listing status are confirmed on the quotation.

CAPACITY & COMPUTE

Capacity for owners. Compute for AI teams.

Two services for operational facilities.

  • FOR OWNERS

    Tenant sourcing

    Owners with available capacity are matched with operators, AI companies and enterprises, with lease terms structured for both parties.

    • Colocation, wholesale and powered shell
    • Tenant qualification and technical fit
    • Density, cooling and term matched to the facility
    • Available for any qualified facility
    Tenant sourcing
  • FOR AI TEAMS

    B100 / B200 compute leasing

    NVIDIA Blackwell GPU clusters by the node, rack or cluster, for training and inference. No facility, no power contract, no capital budget.

    • HGX B100 / B200 nodes, 8 GPUs per node
    • High-bandwidth fabric for multi-node training
    • Monthly to multi-year reserved terms
    • Hosted in facilities within the Crown Mountain project network
    GPU leasing

GPU availability, configuration and pricing are confirmed per request. Tenant engagements are structured per facility and disclosed only to qualified counterparties.

CLIENTS

Focused on the 5–100 MW segment

Projects that require a professional delivery team, below the threshold of hyperscale EPC contractors.

  • 01

    Small and mid-size developers

    Planning a 5–100 MW facility and seeking one partner for feasibility, design, delivery and equipment.

    Build · Equip · Fill

  • 02

    Mining operators

    Existing power and buildings, with plans to move into AI/HPC hosting.

    Convert · Equip · Fill

  • 03

    Land and power holders

    Sites with secured grid capacity, seeking development and early tenant commitment.

    Build · Fill

  • 04

    AI companies and enterprises

    Immediate requirements for Blackwell-class GPU capacity, by the node or the cluster.

    Compute

  • 05

    EPCs, utilities and industrial buyers

    Self-performed facilities requiring long-lead power equipment on a single schedule, with service in North America.

    Equip

ANSWERS

Frequently Asked Questions

Common questions from owners, mining operators and equipment buyers. Other inquiries receive a response within one business day.

What services does Crown Mountain Solutions provide?

Crown Mountain develops 5–100 MW data centres through four services: construction consulting and turnkey delivery of new facilities; conversion of crypto-mining sites to AI/HPC; supply of power equipment (transformers, switchgear, SST, UPS, PDU, busway, cable); and capacity services, comprising tenant sourcing and NVIDIA B100 / B200 GPU leasing. Each service is available individually or as a complete engagement.

What project size does Crown Mountain take on?

5 to 100 MW. Below 5 MW, equipment supply and compute leasing are available. Above 100 MW, Crown Mountain typically participates as construction consultant or equipment supplier rather than turnkey contractor.

Where has Crown Mountain delivered projects?

Offices are located in Austin, Texas and Richmond, British Columbia. Data centre and power projects have been delivered in China, Vietnam, Malaysia, Japan, South Korea, Canada, the United States and Costa Rica, including Prince George and Cranbrook in BC, Nha Trang, Penang and Ohio. Each project is adapted to local codes, utility requirements and permitting, and built with qualified local contractors.

How does a mining-site conversion work, and why is it faster?

A mining site already has grid power, transformers, buildings and often cooling water. The assessment identifies what can be retained; redundancy is then upgraded (typically N to N+1), air cooling is replaced with liquid-ready systems, distribution is rebuilt for 40–130 kW racks, and network and security are upgraded. Because the grid connection already exists, time-to-power is typically several months shorter than a new build. Conversions can be phased so mining revenue continues while HPC halls come online.

Does Crown Mountain build facilities or provide consulting only?

Both. As construction consultant, Crown Mountain provides site and power due diligence, design review, specification, EPC management and commissioning oversight while a local contractor builds. As turnkey contractor, Crown Mountain delivers the complete facility, including substations, cooling plant, generators and fibre. The role is agreed per project and stated in each reference.

Is equipment available without construction services?

Yes. Available equipment includes transformers (oil-immersed to 180 MVA, dry-type, ANSI pad-mounted), MV/LV switchgear, solid-state transformers, three-phase UPS from 10 kVA to 2.5 MW, PDUs, busway and cable from JST, Pearl Electric, China XD, Shunde TBEA, Dongfang Electric, CATL and Delta. UL / CSA listing is confirmed per model. Complete power systems are also available: Dongfang Electric gas turbines + CATL storage + Delta SST for sites without timely grid capacity, and Delta UPS + CATL lithium batteries for critical power. Selected transformers are held in North American stock, with spare parts and a field service team in Texas.

How does tenant sourcing work?

The owner provides available capacity, density, cooling and lease term. Crown Mountain qualifies operators, AI companies and enterprises with a matching profile and structures a colocation, wholesale or powered-shell lease. The service applies to any qualified facility. Fees are agreed per engagement.

What GPU compute is available, and on what terms?

NVIDIA B100 and B200 in HGX configuration, eight GPUs per node, available by the node, rack or cluster, with high-bandwidth interconnect for multi-node workloads. Terms range from monthly reserved capacity to multi-year contracts. Capacity is hosted in facilities within the Crown Mountain project network. Availability, configuration and pricing are confirmed per request.

GET IN TOUCH

Project inquiries

Site, capacity and timeline are sufficient to begin. Responses are provided within one business day.

Office
5900 Balcones Drive STE 100 Austin, TX 78731, USA
Typical response time

Responses are provided within one business day. Urgent requirements noted in the message are prioritised.

Inquiries are handled confidentially. Client details are never shared.