AI-ready data centres, from site to tenant.
Single-point delivery for 5–100 MW projects.
- 5–100 MW new builds
- Prefabricated data centres with Delta
- Power equipment in about 3 months
- Mining-site to AI/HPC conversion
- Tenant sourcing · B100 / B200 compute
Crown Mountain Solutions delivers 5–100 MW data centres: construction consulting, prefabricated modules built with Delta, mining-site conversion and the complete power chain. Power equipment ships in about three months, half the usual North American lead time. Project experience in eight countries, with offices in Texas and British Columbia.
- Project range
- 5–100 MWProject range
- Countries with delivered projects
- 8Countries with delivered projects
- Power-industry experience
- 30+ yrsPower-industry experience
- Projects completed, 2021–2026
- 60+Projects completed, 2021–2026
End-to-end data centre solutions
Consulting, construction, equipment and leasing, structured around the project lifecycle. Each service is available individually or as a complete engagement.
01BUILDData Centre Construction Consulting
Planning, design management and turnkey delivery for 5–100 MW facilities, from site due diligence to handover.
- Site, power and grid-connection due diligence
- Design review, EPC management, commissioning
- Prefabricated power, cooling and IT modules with Delta
02CONVERTMining-Site Conversion
Conversion of crypto-mining facilities into AI/HPC data centres. Existing power infrastructure is retained; cooling, distribution and redundancy are upgraded.
- Power reuse, redundancy upgrade
- Air to liquid-ready cooling
- Structural, network and security upgrades
03EQUIPPower Equipment Supply
Transformers, switchgear, SST, UPS, PDU, busway and cable from Chinese tier-one manufacturers. Complete power systems available. Spares and service in North America.
- Delta · CATL · Oriental Gas · JST · Pearl Electric
- Gas turbine + storage + SST, or UPS + lithium battery
- Spare-parts centre and field team in Texas
04FILL & COMPUTECapacity & Compute
Tenants for owners with capacity to fill. NVIDIA B100 / B200 GPU clusters for teams that need compute now.
- Colocation, wholesale and powered-shell tenants
- B100 / B200 by node, rack or cluster
- Monthly to multi-year terms
From site to revenue
A data centre generates revenue only once it is energised and leased. Most schedule risk sits in the hand-offs between consultant, contractor, equipment vendor and leasing broker. Crown Mountain covers every stage under one engagement.
Engagements can begin at any stage and continue through to operation.
- Project range
- 5–100 MWProject range
- Project stages covered
- 6Project stages covered
- Countries delivered
- 8Countries delivered
- 01
Site & power
Grid capacity, connection path, water, fibre and permitting, assessed before capital is committed.
- 02
Design
Load schedule, single-line diagram, redundancy topology and equipment schedule, sized to target tenant requirements.
- 03
Build
EPC management or turnkey delivery, including substations, cooling plant, generators and fibre.
- 04
Equip
The full power chain from qualified manufacturers, tested and delivered on a single schedule.
- 05
Fill
Tenants matched to available capacity, density and term.
- 06
Compute
B100 / B200 GPU capacity leased to AI teams.
Owners typically engage at site selection or conversion. Equipment buyers and compute tenants typically engage at stages four and six.
Three criteria owners evaluate first
Delivery capability, time-to-power and accountability.
Proven delivery
Data centre and power projects delivered in eight countries. Each project is adapted to local codes, utility requirements, permitting and contractors. North American offices manage contracts, compliance and site coordination.
- Projects in China, Vietnam, Malaysia, Japan, South Korea, Canada, the US and Costa Rica
- Engineers who have designed complete data centre power systems
- Offices in Austin, TX and Vancouver, BC
Faster to power
Transformers, switchgear and UPS carry the longest lead times in any build. Crown Mountain supplies this equipment directly. Most products ship within three months, about half the usual North American lead time, and air freight is available for urgent orders.
- Direct relationships with Delta, CATL, Oriental Gas, JST and Pearl Electric
- UL-certified equipment, stock units and priority production slots
- Mining-site conversions reuse existing power and save months
Single point of accountability
Consulting, delivery and equipment supply under one contract. Scope, schedule and warranty are held by one party.
- One engagement for consulting, delivery and equipment
- Spare parts and field service in North America after handover
- Tenant sourcing and compute leasing aligned with the delivered facility
Figures are stated per project. Confidential references are disclosed only to the extent permitted.
LeadershipSelected projects
Mining-site conversions in British Columbia and Ohio. New builds in Malaysia and Canada. Consulting in Vietnam. Equipment for hyperscale campuses in the US.

Mining facility converted to AI/HPC data centre
A hydro-powered crypto-mining site rebuilt for high-density AI and HPC. Utility intake and transformers were kept. Cooling, distribution and redundancy were rebuilt.

Mining campus converted to HPC, in phases
A large mining campus converted hall by hall. Mining revenue continues while HPC capacity comes online. Power infrastructure is reused; cooling and distribution are upgraded in phases.

New data centre campus, phase 1
Greenfield campus for a regional operator serving Southeast Asian cloud and enterprise demand. Crown Mountain served as construction consultant through design and phase 1 delivery, and supplied the medium-voltage and critical-power equipment.
Eight countries, adapted to each market
Markets with delivered data centre or power projects. Each project follows local codes, utility rules and permitting, with qualified local contractors.
- CanadaCA
Prince George and Cranbrook, BC. Utility transformer deliveries. Office in Vancouver, BC.
- United StatesUS
Ohio conversion. Memphis, Detroit and Georgia equipment. Texas storage. Head office in Austin.
- Mainland ChinaCN
Data centre and power projects.
- VietnamVN
Nha Trang data centre, construction consulting through commissioning.
- MalaysiaMY
Penang campus, design management, construction consulting and equipment.
- JapanJP
Data centre and power infrastructure projects. Details on request.
- South KoreaKR
Data centre and power infrastructure projects. Details on request.
- Costa RicaCR
Data centre project delivery. Details on request.
Power equipment for third-party builds
EPC contractors, developers and utilities can procure equipment independently of construction services. Long-lead power equipment from Chinese tier-one manufacturers is supplied on a single schedule, with spares and field service in North America. On-site generation is available where grid capacity is constrained.
- Transformers to 180 MVA / 230 kV, dry-type to 69 kV, ANSI pad-mounted. All products UL certified
- On-site power systems: Oriental Gas gas turbines + CATL battery storage + solid-state transformers from Delta or JST
- Critical power: Delta three-phase UPS 10 kVA – 2.5 MW with CATL lithium batteries, supplied and commissioned together
- Transformer units in North American stock, nameplates published. Spare-parts centre and field team in Texas

- JST 金盘科技Transformers · switchgear
- Pearl Electric 明珠电气Transformers · switchgear
- Oriental Gas 东方燃气Gas turbine generation
- CATL 宁德时代Energy storage · LFP batteries
- Delta 台达SST · UPS · PDU · busway
Equipment is selected per project for ratings, certification and lead time, and supplied under Crown Mountain's terms, warranty and after-sales support. All products are UL certified. Products from other tier-1 manufacturers are available on request. Send a specification or single-line diagram to start.
Complete power systems from Chinese tier-one manufacturers
Two pre-engineered systems. One contract, one schedule, one warranty. The manufacturer is named on every block.
- ON-SITE GENERATION
Gas turbine + storage + SST
- Gas turbine generationOriental Gas 东方燃气
- Battery energy storageCATL 宁德时代
- Solid-state transformerDelta · JST 台达 · 金盘
For sites with no grid capacity or a connection years away. Oriental Gas gas turbines generate on site. CATL batteries smooth the load and cover starts and peaks. Solid-state transformers from Delta or JST convert MV AC to DC distribution for the hall. Sized, delivered and commissioned as one system.
Best for: behind-the-meter data centres and mining-site conversions that cannot wait for the utility; 5–100 MW.
- CRITICAL POWER
UPS + lithium battery
- Three-phase UPSDelta 台达
- Lithium battery systemCATL 宁德时代
Delta three-phase UPS, 10 kVA to 2.5 MW, with CATL lithium iron phosphate batteries. Longer runtime in less space than VRLA. Battery, UPS and bypass supplied and commissioned by one team.
Best for: new halls, conversions and UPS replacements; N+1 and 2N.
Ratings, redundancy and battery runtime are engineered per project. Test reports and certification documents are provided with the quotation.
Capacity for owners. Compute for AI teams.
Two services for operational facilities.
- FOR OWNERS
Tenant sourcing
Owners with available capacity are matched with operators, AI companies and enterprises, with lease terms structured for both parties.
- Colocation, wholesale and powered shell
- Tenant qualification and technical fit
- Density, cooling and term matched to the facility
- Available for any qualified facility
- FOR AI TEAMS
B100 / B200 compute leasing
NVIDIA Blackwell GPU clusters by the node, rack or cluster, for training and inference. No facility, no power contract, no capital budget.
- HGX B100 / B200 nodes, 8 GPUs per node
- High-bandwidth fabric for multi-node training
- Monthly to multi-year reserved terms
- Hosted in facilities within the Crown Mountain project network
GPU availability, configuration and pricing are confirmed per request. Tenant engagements are structured per facility and disclosed only to qualified counterparties.
Focused on the 5–100 MW segment
Projects that require a professional delivery team, below the threshold of hyperscale EPC contractors.
- 01
Small and mid-size developers
Planning a 5–100 MW facility and seeking one partner for feasibility, design, delivery and equipment.
Build · Equip · Fill
- 02
Mining operators
Existing power and buildings, with plans to move into AI/HPC hosting.
Convert · Equip · Fill
- 03
Land and power holders
Sites with secured grid capacity, seeking development and early tenant commitment.
Build · Fill
- 04
AI companies and enterprises
Immediate requirements for Blackwell-class GPU capacity, by the node or the cluster.
Compute
- 05
EPCs, utilities and industrial buyers
Self-performed facilities requiring long-lead power equipment on a single schedule, with service in North America.
Equip
Frequently Asked Questions
Common questions from owners, mining operators and equipment buyers. Other inquiries receive a response within one business day.
What services does Crown Mountain Solutions provide?
Crown Mountain develops 5–100 MW data centres through four services: construction consulting and turnkey delivery of new facilities; conversion of crypto-mining sites to AI/HPC; supply of power equipment (transformers, switchgear, SST, UPS, PDU, busway, cable); and capacity services, comprising tenant sourcing and NVIDIA B100 / B200 GPU leasing. Each service is available individually or as a complete engagement.
What project size does Crown Mountain take on?
5 to 100 MW. Below 5 MW, equipment supply and compute leasing are available. Above 100 MW, Crown Mountain typically participates as construction consultant or equipment supplier rather than turnkey contractor.
Where has Crown Mountain delivered projects?
Offices are located in Austin, Texas and Vancouver, British Columbia. Data centre and power projects have been delivered in China, Vietnam, Malaysia, Japan, South Korea, Canada, the United States and Costa Rica, including Prince George and Cranbrook in BC, Nha Trang, Penang and Ohio. Each project is adapted to local codes, utility requirements and permitting, and built with qualified local contractors.
How does a mining-site conversion work, and why is it faster?
A mining site already has grid power, transformers, buildings and often cooling water. The assessment identifies what can be retained; redundancy is then upgraded (typically N to N+1), air cooling is replaced with liquid-ready systems, distribution is rebuilt for 40–130 kW racks, and network and security are upgraded. Because the grid connection already exists, time-to-power is typically several months shorter than a new build. Conversions can be phased so mining revenue continues while HPC halls come online.
Does Crown Mountain build facilities or provide consulting only?
Both. As construction consultant, Crown Mountain provides site and power due diligence, design review, specification, EPC management and commissioning oversight while a local contractor builds. As turnkey contractor, Crown Mountain delivers the complete facility, including substations, cooling plant, generators and fibre. The role is agreed per project and stated in each reference.
Is equipment available without construction services?
Yes. Available equipment includes transformers (oil-immersed to 180 MVA, dry-type, ANSI pad-mounted), MV/LV switchgear, solid-state transformers, three-phase UPS from 10 kVA to 2.5 MW, PDUs, busway and cable from JST, Pearl Electric, Oriental Gas, CATL and Delta. All products are UL certified. Complete power systems are also available: Oriental Gas gas turbines + CATL storage + SST from Delta or JST for sites without timely grid capacity, and Delta UPS + CATL lithium batteries for critical power. Selected transformers are held in North American stock, with spare parts and a field service team in Texas.
How does tenant sourcing work?
The owner provides available capacity, density, cooling and lease term. Crown Mountain qualifies operators, AI companies and enterprises with a matching profile and structures a colocation, wholesale or powered-shell lease. The service applies to any qualified facility. Fees are agreed per engagement.
What GPU compute is available, and on what terms?
NVIDIA B100 and B200 in HGX configuration, eight GPUs per node, available by the node, rack or cluster, with high-bandwidth interconnect for multi-node workloads. Terms range from monthly reserved capacity to multi-year contracts. Capacity is hosted in facilities within the Crown Mountain project network. Availability, configuration and pricing are confirmed per request.
Project inquiries
Site, capacity and timeline are sufficient to begin. Responses are provided within one business day.
- Office
- 5900 Balcones Drive STE 100 Austin, TX 78731, USA
- Phone
- +1 (915) 200-6779
Responses are provided within one business day. Urgent requirements noted in the message are prioritised.